LocationTampa Bay · I-275 corridor
Project typeBridge & causeway
SectorPublic infrastructure (FDOT)
Sapphire’s roleHauling & material delivery
The project
What we delivered
The Howard Frankland is one of the busiest crossings in Tampa Bay. Work on the causeway leaves no room for error: one way in, live lanes beside you and water on both sides.
Sapphire trucks moved material along the corridor on the contractor’s sequence, inside live traffic and on fixed work windows.
Scope of work
- Hauling of fill and base along the causeway corridor
- Deliveries sequenced to the paving and placement crews
- Day and night shifts to hold the schedule
- GPS-tracked trucks and digital tickets on every load