State Road 70 Reconstruction

Home / Projects / State Road 70

Featured project

State Road 70 Reconstruction

Florida · FDOT corridor

LocationFlorida · FDOT corridor
Project typeHighway widening
SectorPublic infrastructure (FDOT)
Sapphire’s roleEmbankment & fill hauling
The project

What we delivered

The State Road 70 reconstruction widened a rural highway corridor through long stretches of new embankment, side by side with open traffic.

Sapphire supplied the trucks and kept embankment and fill moving to the grade crews along the alignment.

Scope of work

  • Embankment and fill hauling along the widening
  • Continuous truck cycles sized to the production rate
  • Work beside live lanes with traffic control in place
  • Material tracked load by load for the prime contractor